Power Continuity for Science & Research

Precision Without Interruption

At the forefront of cutting-edge research and development, Shenton Group provides reliable power solutions to keep some of the UK’s most essential programmes in motion. From laboratories to research campuses and science parks, our generator and UPS systems ensure uninterrupted operations where precision, safety, and uptime are non-negotiable.

What’s at Risk When Power Fails in Scientific Environments?

  • Experiment Disruption: Power loss mid-process can invalidate results and waste valuable resources. Chillers can lose power, spoiling materials and samples
  • Data Loss: Sensitive research data and analytics systems are vulnerable to corruption or loss.
  • Equipment Damage: High-spec lab instruments require stable power to avoid costly damage.
  • Funding & Compliance Risks: Interruptions can breach grant conditions or regulatory standards.
  • Reputation Impact: Delays or failures can affect partnerships, publications, and global standing.

Why Scientists and Innovators Trust Shenton Group

  • Over 40 years of experience in critical power environments.
  • NICEIC and ISO-certified installations.
  • Trusted by science parks, universities, and research bodies.
  • Fast emergency response and nationwide coverage.
  • Dedicated support team with sector-specific expertise.

Our Latest News

  • M

    Mon, August 18, 2014 – Group Operations Manager of Racing Circuit

    Mon, August 18, 2014 – Group Operations Manager of Racing Circuit Thank you very much for helping us out of a hole a couple of weekends ago with supply of the emergency generator and please pass on my thanks to Doug as well. We had 300+ guests in the suites on the Sunday and all … Continued
  • T

    Thu, June 30, 2011 – Electrical Design Engineer at the University of East Anglia

    Thu, June 30, 2011 – Electrical Design Engineer at the University of East Anglia We have received excellent service from shentongroup, which was able to advise us on the best possible way of ensuring that all our essential equipment could continue functioning during powercuts.
  • M

    Mon, December 05, 2016 – Facilities and Contracts Manager, Major Retailer

    Can I also pass on my thanks to your team involved in the installation project? They were extremely professional, effective and focussed throughout. It is a pleasure working with such a conscientious and capable team.
  • T

    Thurs, March 30, 2017 – PA & Team Secretary, M&E Company

    I just wanted to send an email with the feedback from attendees for the Combined Heat & Power CPD yesterday. Staff have said it was an excellent example of what a CPD session should be (by all accounts they have had some rather poor one’s in the past) and they asked me to feed this … Continued
  • T

    Thu, September 29, 2011 – Projects Manager MOD Site

    Thu, September 29, 2011 – Projects Manager MOD Site shentongroup site operatives were clean and tidy, courteous and professional in their conduct.
  • S

    Sun, July 31, 2013 – Construction Project Manager for UK and Ireland at Large Retail Property Investment Company

    Wed, July 31, 2013 – Construction Project Manager for UK and Ireland at Large Retail Property Investment Company I have had the chance to review the installation works on the new SO generator; and wanted to say that I am happy with the standard of works. Walking the installation, everything looks to be good and … Continued
  • O

    Owner – Radio Station

    I can’t thank you and your team enough for your help with the generator over the weekend. It was the one single thing that I could worry about the least (apart from where to find the fuel gauge!).  It was easy to deal with you, the generator was delivered on time, a lovely piece of … Continued
  • F

    Fri, January 04, 2013- Electrical Reseller

    Fri, January 04, 2013-  Electrical Reseller Just to say a big big ‘thank you’ to Steve for all his help today. We were a bit held up and Steve was such a help.
  • M

    Matthew Butt – Managing Director at Netwise Data Centre

    I have been using Shenton for over 5 years now, they were brought on board to initially diagnose a small fault at our data centre in South London and now they supply, install, service and load bank our entire generator estate. Their knowledge in the backup power space is second to none and despite growing … Continued
  • M

    Mon, January 19, 2015 – Information Services, University

    Mon, January 19, 2015 – Information Services, University I’d like to offer a big THANK YOU for the work completed on Saturday. We are delighted with the result.  
  • S

    Sun, June 19, 2011 – Manufacturing Director

    Sun, June 19, 2011 – Manufacturing Director We were recommended to shentongroup by our electrician and the company’s engineers carried out a very detailed survey.
  • F

    Fri, July 25, 2014 – Tyre Specialists

    Fri, July 25, 2014 – Tyre Specialists Very happy with your company, we have a lot of power outages where we are and your generators have never failed to start, been excellent and the service is good. Don’t worry I would never think of going anywhere else when other project arise.

Secure Your Power, Protect Your Progress

Let’s design a power solution that keeps your research moving, without interruption. Speak to the UK’s leading technical experts today.