Reliable Power Solutions for Education Facilities

Whether you manage a school or a large educational campus, continuous heat and power is essential for safety, comfort, and uninterrupted learning. Power failures can disrupt classes, damage equipment, and create compliance risks – issues no Facilities Manager wants to face.

Why Power Continuity Matters for Education

  • Protect Learning Environments – Ensure classrooms, labs, and IT systems stay operational.
  • Meet Compliance Standards – Avoid costly downtime and maintain health and safety obligations.
  • Peace of Mind for FM Teams – Reliable backup solutions reduce risk and stress for on-site managers.

Optimising CHP Systems for Efficiency

Combined Heat and Power (CHP) systems generate heat and electricity simultaneously, making them ideal for larger educational sites with significant hot water demand. Campuses with swimming pools, sports facilities, or student accommodation often benefit most from CHP technology for heating and power.

These systems lower energy costs, can reduce carbon emissions by up to 30%, and help meet sustainability targets.

At Shenton Group, we maintain and optimise CHP systems to ensure they operate at peak efficiency and deliver the highest possible return on investment. For educational facilities running long hours, this means lower bills, greener energy, and reliable performance without compromise.

Backup Power Solutions

If the unthinkable happens and mains power fails, having a backup generator system ensures your site isn’t left in the dark. We design robust solutions for resilience and compliance, giving FM teams confidence that critical life safety services such as emergency lighting and lifts will continue to operate.

When a permanent generator isn’t required, our Power Call emergency generator rental connection service provides rapid response and peace of mind.

Ready to Protect Your Campus?

Contact Us

Our Latest News

  • Case Study: Powering 150 Fibre Network Sites with Uninterrupted Power Solutions

    Location: NationwideClient: Leading National Fibre Network ProviderEnd User: Businesses and Consumers NationwideSector: Fibre Network Infrastructure Products/Services Used: Client Overview Our client is a leading national fibre network provider operating across 190+ sites. They deliver high-speed connectivity to businesses and consumers, relying on resilient power infrastructure to maintain continuous service availability. Their operations are critical to … Continued

  • Case Study: Shenton Group Provides Reliable Power to Global Biopharmaceutical Distribution Centres

    Sector: PharmaceuticalsLocation: Liverpool Products/ Services Background A global biopharmaceutical company, based in the north west of the UK, was expanding due to the increase in demand for pharmaceutical supplies during the COVID-19 pandemic. Further manufacturing and cold storage were required on-site, and temporary power was needed for this expansion. Project Overview Shenton Group was tasked … Continued

  • Case Study – Porton Science Park

    Client: Wiltshire CouncilSector: Local AuthorityLocation: Porton Down Products/Services Background Porton Science Park provides a platform for Science and Technology to innovate in an environment that welcomes and supports new business start ups. Working in partnership with Wiltshire council and DSTL (the Ministry of Defence’s Defence and Science Technology Laboratory), who are an existing customer, Shenton … Continued

  • Case Study: Amazon Distribution Centres

    Client: Amazon Direct Sector: Distribution Location: Tilbury Products/ Services Background Amazon Direct is one of the largest distributors in the UK with over 30 warehouses operating currently. In 2021 an unplanned service requirement arose in one of Amazon’s distribution centres, which resulted in the requirement for a rental generator. Shenton Group were asked to provide … Continued

  • Backup Generator Solution for Ilona Rose House

    Client: Gratte BrothersSector: Mixed-Use Development Location: Soho, London Products/Services Background Ilona Rose House, set in the heart of Soho, London, is a 31,0,00sqm new-build project spread over 13 floors, including four below ground. With a build cost of £100m, the development will contain shops, restaurants, bars, offices, residential apartments, a gallery and a nightclub. Shenton Group … Continued

  • Providing Power Continuity to Virgin Media

    The Virgin Media Technology Service Centre, a campus facility in Knowsley, UK, was subject to technical upgrading of its supportive infrastructure to better enhance the power resilience to the site.

    The existing Diesel Rotary Uninterruptible Power Supplies (DRUPS) technology became extremely expensive to maintain, leading to the decision to upgrade the equipment. Shenton Group was once again entrusted with this project due to an ongoing relationship with previous power installations for Virgin Media.

  • Wed, September 18, 2013 – Prepayment Operations & Client Manager for a Global Technology Company

    Wed, September 18, 2013 – Prepayment Operations & Client Manager for a Global Technology Company Just to let you know that all went well and install is completed.  Thanks for a strerling job once again.  Pass my thanks onto Alex and Andrew.
  • Fri, April 26, 2013 – Director, Consultants

    Fri, April 26, 2013 – Director, Consultants I take pleasure in writing formally to you for the very impressive performance provided by you and your company in delivering the new generator to the site. As you know our clients timescale for delivering this project was extremely tight in terms of both delivery and installation. Thanks … Continued
  • District Council

    With Power Call, we are confident that the Council can meet its business continuity and resilience obligations under the Civil Contingencies Act 2004 through an effective and reliable power security plan.
  • Fri, July 29, 2011 – Manager – Theatre

    Fri, July 29, 2011 – Manager – Theatre We didn’t want to have to buy another generator, so contacted shentongroup to see if it was possible to change it from single to three phase power. The company has always looked after us very well so we knew we could rely on them, and, needless to say, … Continued
  • Engineering Manager – Hospital

    Thank you very much for your help.  Shentons provided a very good, fast service.  
  • Sun, September 11, 2011 – Facilities Manager Software Company – Reading

    Sun, September 11, 2011 – Facilities Manager Software Company – Reading shentongroup engineers were exceptionally clean and tidy and carried out a quality installation. The project was completed on time and was good value for money.
  • Building Service Manager – Large M&E Company

    Dear all, I am pleased to announce that ****** have successful handed over the ******* project within our contract date. It is a massive achievement and I would like to take this opportunity to thank you all for the time and effort you have all put in. I’m sure we would of not achieved it … Continued
  • Tue, May 03, 2011 – Infrastructure Technical Team Leader.

    Tue, May 03, 2011 – Infrastructure Technical Team Leader. shentongroup won the tender by not only providing the most competitive price but also on their proven track record.
  • Manager – Wireless Network Distributor

    Shenton Group has done an amazing job. Now we can maintain continuity when powercuts occur as lighting, IT equipment, telephones, heating and air conditioning are all supported by the UPS and the Power Call service. We are extremely impressed with the company and its service, support and expertise.
  • Tues, May 03, 2016 – Strategic Sales Manager, Client

    Tues, May 03, 2016 – Strategic Sales Manager, Client Thank you very much for this completion certificate and thanks to all the team, another quality installation from start to finish. I saw the installation on Friday and all seems to be ship ‘shaped!
  • Tues, October 28, 2014 – Manager, Important Historical Building

    Tues, October 28, 2014 – Manager, Important Historical Building I’d would like to thank you and the Shenton Group for acting so quickly in removing the generator from site. This has enabled the restoration works at ********* to take place and with a few days grace so we are all delighted. I understand that the … Continued
  • Tue, July 02, 2013 – Manager, Hire Company

    Tue, July 02, 2013 – Manager, Hire Company Chloe couldn’t do enough to help with the whole hire, she was great and makes you want to hire again and again. Would want to deal with her all the time – you know the job is going to be done. The guys on site were very … Continued