24/7 Emergency Call-Out

Dark Overlay

Education

Reliable Power Solutions for Education Facilities

Whether you manage a school or a large educational campus, continuous heat and power is essential for safety, comfort, and uninterrupted learning. Power failures can disrupt classes, damage equipment, and create compliance risks – issues no Facilities Manager wants to face.

Why Power Continuity Matters for Education

  • Protect Learning Environments – Ensure classrooms, labs, and IT systems stay operational.
  • Meet Compliance Standards – Avoid costly downtime and maintain health and safety obligations.
  • Peace of Mind for FM Teams – Reliable backup solutions reduce risk and stress for on-site managers.

Optimising CHP Systems for Efficiency

Combined Heat and Power (CHP) systems generate heat and electricity simultaneously, making them ideal for larger educational sites with significant hot water demand. Campuses with swimming pools, sports facilities, or student accommodation often benefit most from CHP technology for heating and power.

These systems lower energy costs, can reduce carbon emissions by up to 30%, and help meet sustainability targets.

At Shenton Group, we maintain and optimise CHP systems to ensure they operate at peak efficiency and deliver the highest possible return on investment. For educational facilities running long hours, this means lower bills, greener energy, and reliable performance without compromise.

Backup Power Solutions

If the unthinkable happens and mains power fails, having a backup generator system ensures your site isn’t left in the dark. We design robust solutions for resilience and compliance, giving FM teams confidence that critical life safety services such as emergency lighting and lifts will continue to operate.

When a permanent generator isn’t required, our Power Call emergency generator rental connection service provides rapid response and peace of mind.

Ready to Protect Your Campus?

Contact Us

Our Latest News

  • Case Study: Powering 150 Fibre Network Sites with Uninterrupted Power Solutions

    Location: NationwideClient: Leading National Fibre Network ProviderEnd User: Businesses and Consumers NationwideSector: Fibre Network Infrastructure Products/Services Used: Client Overview Our client is a leading national fibre network provider operating across 190+ sites. They deliver high-speed connectivity to businesses and consumers, relying on resilient power infrastructure to maintain continuous service availability. Their operations are critical to … Continued

  • Case Study: Shenton Group Provides Reliable Power to Global Biopharmaceutical Distribution Centres

    Sector: PharmaceuticalsLocation: Liverpool Products/ Services Background A global biopharmaceutical company, based in the north west of the UK, was expanding due to the increase in demand for pharmaceutical supplies during the COVID-19 pandemic. Further manufacturing and cold storage were required on-site, and temporary power was needed for this expansion. Project Overview Shenton Group was tasked … Continued

  • Case Study – Porton Science Park

    Client: Wiltshire CouncilSector: Local AuthorityLocation: Porton Down Products/Services Background Porton Science Park provides a platform for Science and Technology to innovate in an environment that welcomes and supports new business start ups. Working in partnership with Wiltshire council and DSTL (the Ministry of Defence’s Defence and Science Technology Laboratory), who are an existing customer, Shenton … Continued

  • Case Study: Amazon Distribution Centres

    Client: Amazon Direct Sector: Distribution Location: Tilbury Products/ Services Background Amazon Direct is one of the largest distributors in the UK with over 30 warehouses operating currently. In 2021 an unplanned service requirement arose in one of Amazon’s distribution centres, which resulted in the requirement for a rental generator. Shenton Group were asked to provide … Continued

  • Backup Generator Solution for Ilona Rose House

    Client: Gratte BrothersSector: Mixed-Use Development Location: Soho, London Products/Services Background Ilona Rose House, set in the heart of Soho, London, is a 31,0,00sqm new-build project spread over 13 floors, including four below ground. With a build cost of £100m, the development will contain shops, restaurants, bars, offices, residential apartments, a gallery and a nightclub. Shenton Group … Continued

  • Providing Power Continuity to Virgin Media

    The Virgin Media Technology Service Centre, a campus facility in Knowsley, UK, was subject to technical upgrading of its supportive infrastructure to better enhance the power resilience to the site.

    The existing Diesel Rotary Uninterruptible Power Supplies (DRUPS) technology became extremely expensive to maintain, leading to the decision to upgrade the equipment. Shenton Group was once again entrusted with this project due to an ongoing relationship with previous power installations for Virgin Media.

  • Project Manager – Hospital

    Generator picked up, thank you for all your help and support througout the hire, the generator has been a god send.
  • Fri, November 7, 2014 – Electrical Site Foreman, Building Services Company

    Fri, November 7, 2014 – Electrical Site Foreman, Building Services Company I would like to take this opportunity to thank you and your site team for the excellent service you provided for the recent generator hire at the hospital. Special thanks goes to Tom and Doug for their professional manner in conducting the initial site … Continued
  • Sat, October 01, 2011 – IT Manager, Lift Manufacturers

    Sat, October 01, 2011 – IT Manager, Lift Manufacturers The installation of the air conditioning was completed on time and to our complete satisfaction.
  • Fri, June 13, 2014 – Financial Director of Award winning Butcher

    Fri, June 13, 2014 – Financial Director of Award winning Butcher It’s been a pleasure working with your company and should you wish to use as a reference site in future, please don’t hesitate to contact us.
  • Tue, September 18, 2012 – Facilities Manager – Retail Company

    Tue, September 18, 2012 – Facilities Manager – Retail Company Following our recent power failure I would like to thank the shentongroup, in particular the Rental division for your help and assistance during that very difficult time. shentongroup showed a very high level of customer service which instilled confidence from the first point of contact … Continued
  • Mon, April 29, 2013 – Contractor Supervisor, FM Company

    Mon, April 29, 2013 – Contractor Supervisor, FM Company Just to say a quick thank you to James Hawksworth who helped us out over the weekend. We are quick to moan at people but not so quick in complementing so well done shentongroup.
  • Thu, November 01, 2012 – Electrical Contractor

    Thu, November 01, 2012 – Electrical Contractor Please thank your engineer for his assistance yesterday with rectifying the phase rotation fault. Thank you for all your efforts with the quick turnaround, the client is very happy and pleased with the response to their demands
  • Fri, April 26, 2013 – Electrical Reseller

    Fri, April 26, 2013 – Electrical Reseller They were very impressed with Steve who serviced the genset today. They asked whether they could have him do the services all the time?
  • Account Manager, Generation

    On the whole your company have done extremely well paying on time and when asked to do so. We thank you for this. On this basis and to make future trading easier between ourselves, I have set up a meeting with my Director to discuss increasing your credit limit (among other accounts). Once I have … Continued
  • Thurs, March 30, 2017 – PA & Team Secretary, M&E Company

    I just wanted to send an email with the feedback from attendees for the Combined Heat & Power CPD yesterday. Staff have said it was an excellent example of what a CPD session should be (by all accounts they have had some rather poor one’s in the past) and they asked me to feed this … Continued
  • Wed, September 18, 2013 – Prepayment Operations & Client Manager for a Global Technology Company

    Wed, September 18, 2013 – Prepayment Operations & Client Manager for a Global Technology Company Just to let you know that all went well and install is completed.  Thanks for a strerling job once again.  Pass my thanks onto Alex and Andrew.
  • Tue, May 07, 2013 – Quality Manager, FM Contractor Company

    Tue, May 07, 2013 – Quality Manager, FM Contractor Company Thanks for being so efficient and making the process very smooth. We are very grateful and will look to use you in the future when required.