24/7 Emergency Call-Out

Dark Overlay

Biogas &
Waste to Energy

Home » Sectors and Case Studies » Biogas & Waste to Energy

Reliable CHP Maintenance for Biogas & Waste-to-Energy Plants

Maximising uptime and efficiency is critical for biogas and waste-to-energy facilities. Every hour of downtime impacts revenue and sustainability targets. At Shenton Group, we have many years of experience partnering with biogas sites, ensuring they remain operational around the clock.

Why CHP Maintenance Matters for Biogas Plants

  • Maximise Revenue – High availability ensures consistent energy generation and income.
  • Protect Your Investment – Extend the life of your CHP system with expert maintenance.
  • Meet Sustainability Goals – Maintain optimal performance for greener energy production.

Our Expertise in Biogas & Waste-to-Energy

We specialise in maintaining CHP systems for demanding environments, offering:

  • High tolerance to H₂S for biogas applications.
  • Exceptional electrical efficiency for maximum output.
  • Long service life backed by proactive maintenance and optimisation.

Comprehensive Maintenance Packages

Our tailored maintenance programmes include:

  • 24/7 remote monitoring for real-time performance insights.
  • Flexible response levels, including some of the fastest in the industry.
  • Optimisation services to ensure maximum efficiency and ROI.

This combination delivers outstanding performance and very high availability, helping you achieve consistent output and profitability year after year.

Ready to Optimise Your CHP System?
Speak to our experts today to discuss tailored maintenance solutions for your facility.

Contact Us

Explore Our Biogas Case Studies

See how we’ve helped biogas and waste-to-energy plants maintain reliability and maximise revenue:

View All Case Studies

Our Latest News

  • Case Study: Powering 150 Fibre Network Sites with Uninterrupted Power Solutions

    Location: NationwideClient: Leading National Fibre Network ProviderEnd User: Businesses and Consumers NationwideSector: Fibre Network Infrastructure Products/Services Used: Client Overview Our client is a leading national fibre network provider operating across 190+ sites. They deliver high-speed connectivity to businesses and consumers, relying on resilient power infrastructure to maintain continuous service availability. Their operations are critical to … Continued

  • Case Study: Shenton Group Provides Reliable Power to Global Biopharmaceutical Distribution Centres

    Sector: PharmaceuticalsLocation: Liverpool Products/ Services Background A global biopharmaceutical company, based in the north west of the UK, was expanding due to the increase in demand for pharmaceutical supplies during the COVID-19 pandemic. Further manufacturing and cold storage were required on-site, and temporary power was needed for this expansion. Project Overview Shenton Group was tasked … Continued

  • Case Study – Porton Science Park

    Client: Wiltshire CouncilSector: Local AuthorityLocation: Porton Down Products/Services Background Porton Science Park provides a platform for Science and Technology to innovate in an environment that welcomes and supports new business start ups. Working in partnership with Wiltshire council and DSTL (the Ministry of Defence’s Defence and Science Technology Laboratory), who are an existing customer, Shenton … Continued

  • Case Study: Amazon Distribution Centres

    Client: Amazon Direct Sector: Distribution Location: Tilbury Products/ Services Background Amazon Direct is one of the largest distributors in the UK with over 30 warehouses operating currently. In 2021 an unplanned service requirement arose in one of Amazon’s distribution centres, which resulted in the requirement for a rental generator. Shenton Group were asked to provide … Continued

  • Backup Generator Solution for Ilona Rose House

    Client: Gratte BrothersSector: Mixed-Use Development Location: Soho, London Products/Services Background Ilona Rose House, set in the heart of Soho, London, is a 31,0,00sqm new-build project spread over 13 floors, including four below ground. With a build cost of £100m, the development will contain shops, restaurants, bars, offices, residential apartments, a gallery and a nightclub. Shenton Group … Continued

  • Providing Power Continuity to Virgin Media

    The Virgin Media Technology Service Centre, a campus facility in Knowsley, UK, was subject to technical upgrading of its supportive infrastructure to better enhance the power resilience to the site.

    The existing Diesel Rotary Uninterruptible Power Supplies (DRUPS) technology became extremely expensive to maintain, leading to the decision to upgrade the equipment. Shenton Group was once again entrusted with this project due to an ongoing relationship with previous power installations for Virgin Media.

  • S

    Sat, June 11, 2011 – Senior Building Services Engineer – Construction Comapany

    Sat, June 11, 2011 – Senior Building Services Engineer – Construction Comapany When the power outaged occurred the generator coped very well. shentongroup did an excellent job and I have no hesitation in recommending the company to others and using it again as the need arises.
  • F

    Fri, June 6, 2014 – Senior Project Manager

    Fri, June 6, 2014 – Senior Project Manager Thank you for the email I must say that your engineer on Tuesday was great and all items were concluded on the day
  • T

    Thu, June 30, 2011 – Electrical Design Engineer at the University of East Anglia

    Thu, June 30, 2011 – Electrical Design Engineer at the University of East Anglia We have received excellent service from shentongroup, which was able to advise us on the best possible way of ensuring that all our essential equipment could continue functioning during powercuts.
  • W

    Wed, October 12, 2016 – Electrical Site Foreman, Building Services Company

    May I take this opportunity to thank you and your site team for the excellent service you have provided over the past 3 months at the **********. Special praise needs to go to Tom & Stuart who have shown true dedication and professionalism in delivering a successful project which at times has been a challenge!! … Continued
  • T

    Tues, October 28, 2014 – Manager, Important Historical Building

    Tues, October 28, 2014 – Manager, Important Historical Building I’d would like to thank you and the Shenton Group for acting so quickly in removing the generator from site. This has enabled the restoration works at ********* to take place and with a few days grace so we are all delighted. I understand that the … Continued
  • T

    Tue, November 08, 2011 – Engineer – Electrical Contractor

    Tue, November 08, 2011 – Engineer – Electrical Contractor A quick thank you with regard to the generator you supplied at the weekend. Eveything went like clockwork and all the pieces in the jigsaw fell into place. Again many thanks and next time I need anything like that I will be in touch.
  • W

    Wed, November 23, 2016 – Project Manager, M&E Contractor

    Good to put a face to the name yesterday and well done on the successful commissioning of the CHP at *******************. Firstly, I want to say how excellent Sean your engineer was and the due-diligence and proactive approach really is a credit to your company and a breath of fresh air compared to how these … Continued
  • T

    Tue, October 16, 2012 – Electrical Reseller

    Tue, October 16, 2012 – Electrical Reseller When I have a tricky job that needs doing I call shentongroup.
  • W

    Wed, August 31, 2011 – 10:10:55 – General Manager – Hotel Group

    Wed, August 31, 2011 – 10:10:55 – General Manager – Hotel Group The major powercut focused our minds on the need for additional power support ….
  • T

    Tue, August 02, 2016 – Sustainability & BREEAM Consultant, Consultancy Company

    Tue, August 02, 2016 – Sustainability & BREEAM Consultant, Consultancy Company Thank you for organising the seminar, one of my colleagues mentioned it was the best lunch time seminar he had attended this year!
  • F

    Fri, September 30th, 2016 – Project Manager, Infrastructure Company

    I wanted to thank you for your collaborative and reactive approach throughout the ******* Generator Controller replacement project.  I’d be grateful if you could also pass on myself and Peter’s thanks to the guys in the field who went out of their way to be flexible and help us fit in with ******* requirements and other … Continued
  • M

    Mon, August 18, 2014 – Group Operations Manager of Racing Circuit

    Mon, August 18, 2014 – Group Operations Manager of Racing Circuit Thank you very much for helping us out of a hole a couple of weekends ago with supply of the emergency generator and please pass on my thanks to Doug as well. We had 300+ guests in the suites on the Sunday and all … Continued