24/7 Emergency Call-Out

Dark Overlay

Biogas &
Waste to Energy

Home » Sectors and Case Studies » Biogas & Waste to Energy

Reliable CHP Maintenance for Biogas & Waste-to-Energy Plants

Maximising uptime and efficiency is critical for biogas and waste-to-energy facilities. Every hour of downtime impacts revenue and sustainability targets. At Shenton Group, we have many years of experience partnering with biogas sites, ensuring they remain operational around the clock.

Why CHP Maintenance Matters for Biogas Plants

  • Maximise Revenue – High availability ensures consistent energy generation and income.
  • Protect Your Investment – Extend the life of your CHP system with expert maintenance.
  • Meet Sustainability Goals – Maintain optimal performance for greener energy production.

Our Expertise in Biogas & Waste-to-Energy

We specialise in maintaining CHP systems for demanding environments, offering:

  • High tolerance to H₂S for biogas applications.
  • Exceptional electrical efficiency for maximum output.
  • Long service life backed by proactive maintenance and optimisation.

Comprehensive Maintenance Packages

Our tailored maintenance programmes include:

  • 24/7 remote monitoring for real-time performance insights.
  • Flexible response levels, including some of the fastest in the industry.
  • Optimisation services to ensure maximum efficiency and ROI.

This combination delivers outstanding performance and very high availability, helping you achieve consistent output and profitability year after year.

Ready to Optimise Your CHP System?
Speak to our experts today to discuss tailored maintenance solutions for your facility.

Contact Us

Explore Our Biogas Case Studies

See how we’ve helped biogas and waste-to-energy plants maintain reliability and maximise revenue:

View All Case Studies

Our Latest News

  • Case Study: Powering 150 Fibre Network Sites with Uninterrupted Power Solutions

    Location: NationwideClient: Leading National Fibre Network ProviderEnd User: Businesses and Consumers NationwideSector: Fibre Network Infrastructure Products/Services Used: Client Overview Our client is a leading national fibre network provider operating across 190+ sites. They deliver high-speed connectivity to businesses and consumers, relying on resilient power infrastructure to maintain continuous service availability. Their operations are critical to … Continued

  • Case Study: Shenton Group Provides Reliable Power to Global Biopharmaceutical Distribution Centres

    Sector: PharmaceuticalsLocation: Liverpool Products/ Services Background A global biopharmaceutical company, based in the north west of the UK, was expanding due to the increase in demand for pharmaceutical supplies during the COVID-19 pandemic. Further manufacturing and cold storage were required on-site, and temporary power was needed for this expansion. Project Overview Shenton Group was tasked … Continued

  • Case Study – Porton Science Park

    Client: Wiltshire CouncilSector: Local AuthorityLocation: Porton Down Products/Services Background Porton Science Park provides a platform for Science and Technology to innovate in an environment that welcomes and supports new business start ups. Working in partnership with Wiltshire council and DSTL (the Ministry of Defence’s Defence and Science Technology Laboratory), who are an existing customer, Shenton … Continued

  • Case Study: Amazon Distribution Centres

    Client: Amazon Direct Sector: Distribution Location: Tilbury Products/ Services Background Amazon Direct is one of the largest distributors in the UK with over 30 warehouses operating currently. In 2021 an unplanned service requirement arose in one of Amazon’s distribution centres, which resulted in the requirement for a rental generator. Shenton Group were asked to provide … Continued

  • Backup Generator Solution for Ilona Rose House

    Client: Gratte BrothersSector: Mixed-Use Development Location: Soho, London Products/Services Background Ilona Rose House, set in the heart of Soho, London, is a 31,0,00sqm new-build project spread over 13 floors, including four below ground. With a build cost of £100m, the development will contain shops, restaurants, bars, offices, residential apartments, a gallery and a nightclub. Shenton Group … Continued

  • Providing Power Continuity to Virgin Media

    The Virgin Media Technology Service Centre, a campus facility in Knowsley, UK, was subject to technical upgrading of its supportive infrastructure to better enhance the power resilience to the site.

    The existing Diesel Rotary Uninterruptible Power Supplies (DRUPS) technology became extremely expensive to maintain, leading to the decision to upgrade the equipment. Shenton Group was once again entrusted with this project due to an ongoing relationship with previous power installations for Virgin Media.

  • Tues, January 05, 2016 – Electrical Engineer, Consulting Engineers

    Tues, January 05, 2016 – Electrical Engineer, Consulting Engineers Happy new year to you and many thanks for sending the CPD certificates. Please pass on our appreciation to Richard for what was a truly informative and beneficial CPD seminar.
  • Mon, December 05, 2016 – Facilities and Contracts Manager, Major Retailer

    Can I also pass on my thanks to your team involved in the installation project? They were extremely professional, effective and focussed throughout. It is a pleasure working with such a conscientious and capable team.
  • Fri, March 01, 2013 – IT Manager, College

    Fri, March 01, 2013 – IT Manager, College The set-up went very smoothly. Tom arrived punctually and was very efficient, friendly and professional.
  • Facilities Manager, Risk Management Experts

    Hi Julie, Thank you for your help today.  This is the first time we’ve had a problem with our generator and I was reassured by the quick response.
  • Building Service Manager – Large M&E Company

    James, today’s training went well. Please let your mangers know Alex continued to be very thorough and professional when carrying out his work.
  • Thu, June 30, 2011 – Electrical Design Engineer at the University of East Anglia

    Thu, June 30, 2011 – Electrical Design Engineer at the University of East Anglia We have received excellent service from shentongroup, which was able to advise us on the best possible way of ensuring that all our essential equipment could continue functioning during powercuts.
  • Thurs, June 5, 2014 – Medical Research Company

    Thurs, June 5, 2014 – Medical Research Company Again, please pass along my thanks to Alex for staying on site to rectify the wiring issue for us & avoiding having to re-schedule a visit – very much appreciated. He was a pleasure to deal with, very professional and personable  
  • Fri, April 26, 2013 – Civil Contingencies Officer, Council

    Fri, April 26, 2013 – Civil Contingencies Officer, Council The installation was successfully completed today, thanks to all concerned for your help, support, coorporation and coordination with this project.
  • Site Manager – NHS Trust

    Please can I take the opportunity to thank you, Roy, Paul, Stuart and Tom as well as James, David and Graham for the brilliant work you have delivered in ******* over the course of the past 3 months. The meticulous planning you carried out prior to day one meant that all staff in the clinical and … Continued
  • Private Owner – End User

    …I will use your firm again and will recommend you to anybody for honest and reliable service…
  • Mon, June 20, 2016 – Regional Manager, Mechanical and Electrical Company

    Mon, June 20, 2016 – Regional Manager, Mechanical and Electrical Company As per our email exchange on Friday, many thanks once again for sorting out this difficult situation, once again shentongroup have demonstrated excellent customer care in what was a difficult situation for us all.  We have a few projects starting to come on stream in … Continued
  • Thu, November 01, 2012 – TSO Mechanical & Electrical, FM Company

    Thu, November 01, 2012 – TSO Mechanical & Electrical, FM Company Please can you pass on my thanks to Alex and James for their hard work and professionalism at all times throughout the job. I know working on MOD sites can be a bit tricky at times, with regulations, passes etc but a no times … Continued