24/7 Emergency Call-Out

Dark Overlay

Residential

Home » Sectors and Case Studies » Residential

Reliable Power Solutions for Residential Developments

From apartment complexes to large housing developments, residents expect uninterrupted power for comfort, safety, and connectivity. Power failures can lead to inconvenience, reputational damage for developers, and even compliance risks. Shenton Group ensures residential sites remain operational around the clock with tailored power solutions.

Why Backup Power is Critical for Life Safety

Residential developments and other buildings such as hotels must have adequate backup power – it’s not just a convenience, it’s a legal and safety requirement. In the event of a power outage:

  • Emergency Lighting must remain operational to ensure safe evacuation routes.
  • Lifts and Accessibility Systems must function for vulnerable residents and guests.
  • Fire Safety Systems must stay powered to protect lives.
  • Security Systems such as CCTV and alarms must continue to operate.

Without these measures, compliance is compromised, and the safety of residents and guests is at risk.

Standby Generators, UPS Systems & Battery Storage

Our solutions include:

  • Standby Generators – Ensure power continuity during outages.
  • Generator Hire – Temporary power for planned outages or emergencies
  • Uninterruptible Power Supply (UPS) – Ensures that there is no break in power, providing seamless protection for critical systems.
  • Battery Storage Solutions – Store energy for instant backup and support sustainability goals.
  • Power Call Emergency Generator Hire – Rapid response for urgent requirements.

Battery storage adds an extra layer of resilience, enabling residential sites to store renewable energy, reduce reliance on the grid, and maintain uptime during transitions or outages.

CHP Maintenance and Efficiency

Combined Heat and Power (CHP) systems generate heat and electricity simultaneously, making them ideal for large residential sites and hotels with high hot water demand. CHP can reduce carbon emissions by up to 30%, cut energy costs, and help meet sustainability targets.

At Shenton Group, we maintain and optimise CHP systems to ensure they deliver maximum efficiency and ROI – helping residential developments and similar achieve greener energy and lower bills without compromising reliability.

What Happens When the Power Stops?

Without reliable power, residential developments face serious consequences:

  • Resident Disruption – Loss of heating, lighting, and essential services.
  • Life Safety Risks – Residents and guests could become trapped in lifts or stairwells during an outage.
  • Security Risks – CCTV, alarms, and access control systems fail, compromising safety.
  • Reputational Damage – Complaints and loss of trust from residents and stakeholders.
  • Energy Inefficiency – Rising costs without CHP optimisation and smart energy solutions.
  • Reduced Resilience – Inability to meet sustainability and compliance targets.

Ready to Protect Your Residential Development?
Speak to our experts today to discuss tailored power solutions for your site.

Contact Us

Our Latest News

  • Case Study: Powering 150 Fibre Network Sites with Uninterrupted Power Solutions

    Location: NationwideClient: Leading National Fibre Network ProviderEnd User: Businesses and Consumers NationwideSector: Fibre Network Infrastructure Products/Services Used: Client Overview Our client is a leading national fibre network provider operating across 190+ sites. They deliver high-speed connectivity to businesses and consumers, relying on resilient power infrastructure to maintain continuous service availability. Their operations are critical to … Continued

  • Case Study: Shenton Group Provides Reliable Power to Global Biopharmaceutical Distribution Centres

    Sector: PharmaceuticalsLocation: Liverpool Products/ Services Background A global biopharmaceutical company, based in the north west of the UK, was expanding due to the increase in demand for pharmaceutical supplies during the COVID-19 pandemic. Further manufacturing and cold storage were required on-site, and temporary power was needed for this expansion. Project Overview Shenton Group was tasked … Continued

  • Case Study – Porton Science Park

    Client: Wiltshire CouncilSector: Local AuthorityLocation: Porton Down Products/Services Background Porton Science Park provides a platform for Science and Technology to innovate in an environment that welcomes and supports new business start ups. Working in partnership with Wiltshire council and DSTL (the Ministry of Defence’s Defence and Science Technology Laboratory), who are an existing customer, Shenton … Continued

  • Case Study: Amazon Distribution Centres

    Client: Amazon Direct Sector: Distribution Location: Tilbury Products/ Services Background Amazon Direct is one of the largest distributors in the UK with over 30 warehouses operating currently. In 2021 an unplanned service requirement arose in one of Amazon’s distribution centres, which resulted in the requirement for a rental generator. Shenton Group were asked to provide … Continued

  • Backup Generator Solution for Ilona Rose House

    Client: Gratte BrothersSector: Mixed-Use Development Location: Soho, London Products/Services Background Ilona Rose House, set in the heart of Soho, London, is a 31,0,00sqm new-build project spread over 13 floors, including four below ground. With a build cost of £100m, the development will contain shops, restaurants, bars, offices, residential apartments, a gallery and a nightclub. Shenton Group … Continued

  • Providing Power Continuity to Virgin Media

    The Virgin Media Technology Service Centre, a campus facility in Knowsley, UK, was subject to technical upgrading of its supportive infrastructure to better enhance the power resilience to the site.

    The existing Diesel Rotary Uninterruptible Power Supplies (DRUPS) technology became extremely expensive to maintain, leading to the decision to upgrade the equipment. Shenton Group was once again entrusted with this project due to an ongoing relationship with previous power installations for Virgin Media.

  • Thu, August 29, 2013 – Royal Airforce Base

    Thu, August 29, 2013 – Royal Airforce Base Hi Marcus, just wanted to drop you a quick email to let you know I was really impressed with your guys yesterday.  They all worked like Trojans to get the old system out and the new units in place, the weather was unseasonably warm for Scotland and … Continued
  • Wed, March 15, 2017 – Systems Manager, British University

    Brilliant Stuff Stephanie and you are welcome, I must say you guys have always helped us in a crisis and that counts for a lot… …As usual let me known when you have a team ready for the Hawkeye installation.
  • Mon, April 29, 2013 – Contractor Supervisor, FM Company

    Mon, April 29, 2013 – Contractor Supervisor, FM Company Just to say a quick thank you to James Hawksworth who helped us out over the weekend. We are quick to moan at people but not so quick in complementing so well done shentongroup.
  • Tue, August 23, 2016 – Project Manager, M&E Company

    Tue, August 23, 2016 – Project Manager, M&E Company Can you thank Steve for me for all his hard work to get Hastings completed successfully.
  • David Harbour – Andover Radio

    Sorry – but I can’t give Shenton a higher rating! They are simply superb. Nothing too much trouble.
  • Wed, September 28, 2016 – Manager, National Financial Business

    Just wanted to thank you for all your efforts last week in trying to resolve the issue with the fractured hose.  Really refreshing to receive good old fashioned customer service.  Much appreciated.
  • Mon, August 18, 2014 – Group Operations Manager of Racing Circuit

    Mon, August 18, 2014 – Group Operations Manager of Racing Circuit Thank you very much for helping us out of a hole a couple of weekends ago with supply of the emergency generator and please pass on my thanks to Doug as well. We had 300+ guests in the suites on the Sunday and all … Continued
  • Wed, July 24, 2013 – Director, Building Company

    Wed, July 24, 2013 – Director, Building Company I can confirm we were more than happy with your sevice.
  • Mon, April 14, 2014 – Managing Director of London’s Premiere Data Centre Operator

    Mon, April 14, 2014 – Managing Director of London’s Premiere Data Centre Operator A quick email to thank you both and in addition your engineer who attended site today – I cannot express how professional, knowledgeable and easy to work with he was.  Most don’t take the time to recognise the good, only quickly enough … Continued
  • Mon, June 13, 2016 – Project Manager, Major Engineering Company

    Mon, June 13, 2016 – Project Manager, Major Engineering Company When I checked with my colleagues who’d worked with you before on the Newcastle jobs, they said ‘shentongroup are great to deal with. No concerns at all, and if there are ever any problems on a project they always get them sorted’.
  • Manager – Engineering Services Company

    Many Thanks Shirley.  Excellent job all round
  • Tues, October 28, 2014 – Manager, Important Historical Building

    Tues, October 28, 2014 – Manager, Important Historical Building I’d would like to thank you and the Shenton Group for acting so quickly in removing the generator from site. This has enabled the restoration works at ********* to take place and with a few days grace so we are all delighted. I understand that the … Continued