24/7 Emergency Call-Out

Dark Overlay

Biogas &
Waste to Energy

Home » Sectors and Case Studies » Biogas & Waste to Energy

Reliable CHP Maintenance for Biogas & Waste-to-Energy Plants

Maximising uptime and efficiency is critical for biogas and waste-to-energy facilities. Every hour of downtime impacts revenue and sustainability targets. At Shenton Group, we have many years of experience partnering with biogas sites, ensuring they remain operational around the clock.

Why CHP Maintenance Matters for Biogas Plants

  • Maximise Revenue – High availability ensures consistent energy generation and income.
  • Protect Your Investment – Extend the life of your CHP system with expert maintenance.
  • Meet Sustainability Goals – Maintain optimal performance for greener energy production.

Our Expertise in Biogas & Waste-to-Energy

We specialise in maintaining CHP systems for demanding environments, offering:

  • High tolerance to H₂S for biogas applications.
  • Exceptional electrical efficiency for maximum output.
  • Long service life backed by proactive maintenance and optimisation.

Comprehensive Maintenance Packages

Our tailored maintenance programmes include:

  • 24/7 remote monitoring for real-time performance insights.
  • Flexible response levels, including some of the fastest in the industry.
  • Optimisation services to ensure maximum efficiency and ROI.

This combination delivers outstanding performance and very high availability, helping you achieve consistent output and profitability year after year.

Ready to Optimise Your CHP System?
Speak to our experts today to discuss tailored maintenance solutions for your facility.

Contact Us

Explore Our Biogas Case Studies

See how we’ve helped biogas and waste-to-energy plants maintain reliability and maximise revenue:

View All Case Studies

Our Latest News

  • Case Study: Powering 150 Fibre Network Sites with Uninterrupted Power Solutions

    Location: NationwideClient: Leading National Fibre Network ProviderEnd User: Businesses and Consumers NationwideSector: Fibre Network Infrastructure Products/Services Used: Client Overview Our client is a leading national fibre network provider operating across 190+ sites. They deliver high-speed connectivity to businesses and consumers, relying on resilient power infrastructure to maintain continuous service availability. Their operations are critical to … Continued

  • Case Study: Shenton Group Provides Reliable Power to Global Biopharmaceutical Distribution Centres

    Sector: PharmaceuticalsLocation: Liverpool Products/ Services Background A global biopharmaceutical company, based in the north west of the UK, was expanding due to the increase in demand for pharmaceutical supplies during the COVID-19 pandemic. Further manufacturing and cold storage were required on-site, and temporary power was needed for this expansion. Project Overview Shenton Group was tasked … Continued

  • Case Study – Porton Science Park

    Client: Wiltshire CouncilSector: Local AuthorityLocation: Porton Down Products/Services Background Porton Science Park provides a platform for Science and Technology to innovate in an environment that welcomes and supports new business start ups. Working in partnership with Wiltshire council and DSTL (the Ministry of Defence’s Defence and Science Technology Laboratory), who are an existing customer, Shenton … Continued

  • Case Study: Amazon Distribution Centres

    Client: Amazon Direct Sector: Distribution Location: Tilbury Products/ Services Background Amazon Direct is one of the largest distributors in the UK with over 30 warehouses operating currently. In 2021 an unplanned service requirement arose in one of Amazon’s distribution centres, which resulted in the requirement for a rental generator. Shenton Group were asked to provide … Continued

  • Backup Generator Solution for Ilona Rose House

    Client: Gratte BrothersSector: Mixed-Use Development Location: Soho, London Products/Services Background Ilona Rose House, set in the heart of Soho, London, is a 31,0,00sqm new-build project spread over 13 floors, including four below ground. With a build cost of £100m, the development will contain shops, restaurants, bars, offices, residential apartments, a gallery and a nightclub. Shenton Group … Continued

  • Providing Power Continuity to Virgin Media

    The Virgin Media Technology Service Centre, a campus facility in Knowsley, UK, was subject to technical upgrading of its supportive infrastructure to better enhance the power resilience to the site.

    The existing Diesel Rotary Uninterruptible Power Supplies (DRUPS) technology became extremely expensive to maintain, leading to the decision to upgrade the equipment. Shenton Group was once again entrusted with this project due to an ongoing relationship with previous power installations for Virgin Media.

  • Wed, September 18, 2013 – Prepayment Operations & Client Manager for a Global Technology Company

    Wed, September 18, 2013 – Prepayment Operations & Client Manager for a Global Technology Company Just to let you know that all went well and install is completed.  Thanks for a strerling job once again.  Pass my thanks onto Alex and Andrew.
  • Fri, April 26, 2013 – Director, Consultants

    Fri, April 26, 2013 – Director, Consultants I take pleasure in writing formally to you for the very impressive performance provided by you and your company in delivering the new generator to the site. As you know our clients timescale for delivering this project was extremely tight in terms of both delivery and installation. Thanks … Continued
  • District Council

    With Power Call, we are confident that the Council can meet its business continuity and resilience obligations under the Civil Contingencies Act 2004 through an effective and reliable power security plan.
  • Fri, July 29, 2011 – Manager – Theatre

    Fri, July 29, 2011 – Manager – Theatre We didn’t want to have to buy another generator, so contacted shentongroup to see if it was possible to change it from single to three phase power. The company has always looked after us very well so we knew we could rely on them, and, needless to say, … Continued
  • Engineering Manager – Hospital

    Thank you very much for your help.  Shentons provided a very good, fast service.  
  • Sun, September 11, 2011 – Facilities Manager Software Company – Reading

    Sun, September 11, 2011 – Facilities Manager Software Company – Reading shentongroup engineers were exceptionally clean and tidy and carried out a quality installation. The project was completed on time and was good value for money.
  • Building Service Manager – Large M&E Company

    Dear all, I am pleased to announce that ****** have successful handed over the ******* project within our contract date. It is a massive achievement and I would like to take this opportunity to thank you all for the time and effort you have all put in. I’m sure we would of not achieved it … Continued
  • Tue, May 03, 2011 – Infrastructure Technical Team Leader.

    Tue, May 03, 2011 – Infrastructure Technical Team Leader. shentongroup won the tender by not only providing the most competitive price but also on their proven track record.
  • Manager – Wireless Network Distributor

    Shenton Group has done an amazing job. Now we can maintain continuity when powercuts occur as lighting, IT equipment, telephones, heating and air conditioning are all supported by the UPS and the Power Call service. We are extremely impressed with the company and its service, support and expertise.
  • Tues, May 03, 2016 – Strategic Sales Manager, Client

    Tues, May 03, 2016 – Strategic Sales Manager, Client Thank you very much for this completion certificate and thanks to all the team, another quality installation from start to finish. I saw the installation on Friday and all seems to be ship ‘shaped!
  • Tues, October 28, 2014 – Manager, Important Historical Building

    Tues, October 28, 2014 – Manager, Important Historical Building I’d would like to thank you and the Shenton Group for acting so quickly in removing the generator from site. This has enabled the restoration works at ********* to take place and with a few days grace so we are all delighted. I understand that the … Continued
  • Tue, July 02, 2013 – Manager, Hire Company

    Tue, July 02, 2013 – Manager, Hire Company Chloe couldn’t do enough to help with the whole hire, she was great and makes you want to hire again and again. Would want to deal with her all the time – you know the job is going to be done. The guys on site were very … Continued