24/7 Emergency Call-Out

Dark Overlay

Biogas &
Waste to Energy

Home » Sectors and Case Studies » Biogas & Waste to Energy

Reliable CHP Maintenance for Biogas & Waste-to-Energy Plants

Maximising uptime and efficiency is critical for biogas and waste-to-energy facilities. Every hour of downtime impacts revenue and sustainability targets. At Shenton Group, we have many years of experience partnering with biogas sites, ensuring they remain operational around the clock.

Why CHP Maintenance Matters for Biogas Plants

  • Maximise Revenue – High availability ensures consistent energy generation and income.
  • Protect Your Investment – Extend the life of your CHP system with expert maintenance.
  • Meet Sustainability Goals – Maintain optimal performance for greener energy production.

Our Expertise in Biogas & Waste-to-Energy

We specialise in maintaining CHP systems for demanding environments, offering:

  • High tolerance to H₂S for biogas applications.
  • Exceptional electrical efficiency for maximum output.
  • Long service life backed by proactive maintenance and optimisation.

Comprehensive Maintenance Packages

Our tailored maintenance programmes include:

  • 24/7 remote monitoring for real-time performance insights.
  • Flexible response levels, including some of the fastest in the industry.
  • Optimisation services to ensure maximum efficiency and ROI.

This combination delivers outstanding performance and very high availability, helping you achieve consistent output and profitability year after year.

Ready to Optimise Your CHP System?
Speak to our experts today to discuss tailored maintenance solutions for your facility.

Contact Us

Explore Our Biogas Case Studies

See how we’ve helped biogas and waste-to-energy plants maintain reliability and maximise revenue:

View All Case Studies

Our Latest News

  • Case Study: Powering 150 Fibre Network Sites with Uninterrupted Power Solutions

    Location: NationwideClient: Leading National Fibre Network ProviderEnd User: Businesses and Consumers NationwideSector: Fibre Network Infrastructure Products/Services Used: Client Overview Our client is a leading national fibre network provider operating across 190+ sites. They deliver high-speed connectivity to businesses and consumers, relying on resilient power infrastructure to maintain continuous service availability. Their operations are critical to … Continued

  • Case Study: Shenton Group Provides Reliable Power to Global Biopharmaceutical Distribution Centres

    Sector: PharmaceuticalsLocation: Liverpool Products/ Services Background A global biopharmaceutical company, based in the north west of the UK, was expanding due to the increase in demand for pharmaceutical supplies during the COVID-19 pandemic. Further manufacturing and cold storage were required on-site, and temporary power was needed for this expansion. Project Overview Shenton Group was tasked … Continued

  • Case Study – Porton Science Park

    Client: Wiltshire CouncilSector: Local AuthorityLocation: Porton Down Products/Services Background Porton Science Park provides a platform for Science and Technology to innovate in an environment that welcomes and supports new business start ups. Working in partnership with Wiltshire council and DSTL (the Ministry of Defence’s Defence and Science Technology Laboratory), who are an existing customer, Shenton … Continued

  • Case Study: Amazon Distribution Centres

    Client: Amazon Direct Sector: Distribution Location: Tilbury Products/ Services Background Amazon Direct is one of the largest distributors in the UK with over 30 warehouses operating currently. In 2021 an unplanned service requirement arose in one of Amazon’s distribution centres, which resulted in the requirement for a rental generator. Shenton Group were asked to provide … Continued

  • Backup Generator Solution for Ilona Rose House

    Client: Gratte BrothersSector: Mixed-Use Development Location: Soho, London Products/Services Background Ilona Rose House, set in the heart of Soho, London, is a 31,0,00sqm new-build project spread over 13 floors, including four below ground. With a build cost of £100m, the development will contain shops, restaurants, bars, offices, residential apartments, a gallery and a nightclub. Shenton Group … Continued

  • Providing Power Continuity to Virgin Media

    The Virgin Media Technology Service Centre, a campus facility in Knowsley, UK, was subject to technical upgrading of its supportive infrastructure to better enhance the power resilience to the site.

    The existing Diesel Rotary Uninterruptible Power Supplies (DRUPS) technology became extremely expensive to maintain, leading to the decision to upgrade the equipment. Shenton Group was once again entrusted with this project due to an ongoing relationship with previous power installations for Virgin Media.

  • Wed, February 4, 2015 – Senior Systems Technician, Defence Company

    Wed, February 4, 2015 – Senior Systems Technician, Defence Company The project management of the replacement UPS at ***** was dealt with in a professional manner which included a site recce proving vital to the success of the end result…The services that shentongroup provide to this site is valued. To date, shentongroup have responded in a timely … Continued
  • Manager – Wireless Network Distributor

    Shenton Group has done an amazing job. Now we can maintain continuity when powercuts occur as lighting, IT equipment, telephones, heating and air conditioning are all supported by the UPS and the Power Call service. We are extremely impressed with the company and its service, support and expertise.
  • Team Leader – IT Sector

    Shenton are very reliable, we often see many different engineers with them being a much larger company, but they are all very friendly and professional, we are very confident in their support. The engineers representing their company are always highly professional, capable and a pleasure to be around.  I have regular contact with Teri Phillimore … Continued
  • Mon, March 27, 2017 – Manager, Data Management company

    Good afternoon Terry, I just wanted to pay you an email to give out thanks for the work yourself and Shenton have done with regards to Saturday’s UPS install here at ***********. The Saturday works went ahead as planned and on schedule at 7am our side and by 8am Dan, Callum & Vic had the … Continued
  • Wed, November 18, 2015 – Mechanical Estimator, Building Services Company

    Wed, November 18, 2015 – Mechanical Estimator, Building Services Company The CPD was very informative and well presented. Richard could answer the vast majority of the questions thrown at him; certainly those within the realm of CHP and was friendly and approachable.
  • Engineering Manager – Hospital

    Thank you very much for your help.  Shentons provided a very good, fast service.  
  • Building Service Manager – Large M&E Company

    James, today’s training went well. Please let your mangers know Alex continued to be very thorough and professional when carrying out his work.
  • Building Service Manager – M&E Company

    Just so you know there wasn’t any issues with the generator and working with Alex was a pleasure. Found him very patient, understanding and helpful.
  • Tue, August 23, 2016 – Project Manager, M&E Company

    Tue, August 23, 2016 – Project Manager, M&E Company Can you thank Steve for me for all his hard work to get Hastings completed successfully.
  • Martina – Healthcare

    Martina – Healthcare

    Shenton Group supplied and installed a standby generator at my Company HQ and have been responsible for maintenance and refuelling. The service received has been excellent since the outset, both in terms of planned works and emergency repairs, the engineers have been reliable and effective, and all of the Shenton Group team have worked well … Continued
  • Thu, September 08, 2011 – 10:11:05 – Healthcare Group – Property Services Manager

    Thu, September 08, 2011 – 10:11:05 – Healthcare Group – Property Services Manager Many thanks for your assistance and prompt service yet again!!
  • Mon, February 9, 2015 – Engineering Manager, Product Testing Laboratory

    Mon, February 9, 2015 – Engineering Manager, Product Testing Laboratory Thanks. I must say we were very impressed with how your company reacted to our requirement [Rental]. Myself and our client, *******, were particularly impressed with Tom. He was very polite, positive with good technical knowledge about the equipment and very helpful. A credit to … Continued