24/7 Emergency Call-Out

Dark Overlay

Infrastructure &
Utilities

Home » Sectors and Case Studies » Infrastructure & Utilities

Power Continuity for
Infrastructure & Utilities

In infrastructure and utilities, power failure isn’t just disruptive—it can halt essential services, breach regulatory compliance, and impact thousands of customers. Shenton Group delivers robust backup power and CHP solutions that ensure maximum uptime, reduce energy costs, and support sustainability across complex, high-demand environments. Whether you’re managing pumping stations, treatment plants, or remote utility sites, our systems keep operations running smoothly and communities connected.

What’s at Risk Without Reliable Power?

Utility and infrastructure providers face unique challenges when power fails:

  • Regulatory Breaches – Missed compliance targets and costly penalties.
  • Remote Site Vulnerability – Unplanned outages in hard-to-reach areas disrupt essential services.
  • Service Interruption – Pumping stations, treatment plants, and critical networks go offline.
  • Customer Impact – Loss of water, energy, or connectivity leads to complaints and reputational damage.
  • Environmental Pressure – Missed sustainability and emissions targets without CHP optimisation.
  • Operational Downtime – Delays to maintenance, upgrades, and emergency response.


Tailored Power Solutions for Utilities & Infrastructure

We engineer and maintain power systems that meet the demands of this sector:

  • Single & Three Phase Generators from 300kVA to 3200kVA.
  • Generator Hire: Ideal for temporary works, upgrades, and emergency response.
  • CHP Systems: Comprehensive maintenance that ensures ultimate uptime, greener energy with reduced heat and electricity costs.
  • Powercall: 24/7 emergency generator rental
  • Prime Power Installations: Long-term solutions for remote or off-grid sites.
  • Full Compliance Support: Designed to meet emissions reduction schemes and regulatory standards.

Proven Success in Infrastructure & Utilities

We’ve supported major utility providers and infrastructure projects with reliable power:

  • National Generator Maintenance Support for Gas Network Provider
    Provided ongoing generator maintenance to ensure uninterrupted power for critical gas network operations. Read full case study
  • Turnkey Generator Solution for Welsh Water
    Designed and implemented a complete generator system for a major pumping station, ensuring compliance and reliability. Read full case study
  • DEFRA-Compliant Fuel Pipework for Thames Water’s New Diesel Generators
    Ensured compliance and safety for fuel systems supporting critical water infrastructure.
    Read full case study

Why Infrastructure Leaders Trust Shenton Group

  • Decades of Proven Expertise
    Trusted power solutions for utilities, infrastructure, and critical services.
  • Certified Quality & Compliance
    NICEIC and ISO-approved installations, meeting DEFRA and emissions standards.
  • End-to-End Resilience
    Generators, UPS, CHP, battery storage – plus 24/7 emergency cover via Power Call.
  • Rapid Nationwide Response
    Fast deployment and full UK coverage with sector-specific technical support.
  • Sustainable & Cost-Efficient Solutions
    CHP optimisation and battery storage to cut carbon and energy costs
  • Advanced Monitoring & SLA Protection
    24/7 remote insights, flexible service levels, and guaranteed SLA compliance.

Our Latest News

  • Wed, September 18, 2013 – Prepayment Operations & Client Manager for a Global Technology Company

    Wed, September 18, 2013 – Prepayment Operations & Client Manager for a Global Technology Company Just to let you know that all went well and install is completed.  Thanks for a strerling job once again.  Pass my thanks onto Alex and Andrew.
  • Fri, April 26, 2013 – Director, Consultants

    Fri, April 26, 2013 – Director, Consultants I take pleasure in writing formally to you for the very impressive performance provided by you and your company in delivering the new generator to the site. As you know our clients timescale for delivering this project was extremely tight in terms of both delivery and installation. Thanks … Continued
  • District Council

    With Power Call, we are confident that the Council can meet its business continuity and resilience obligations under the Civil Contingencies Act 2004 through an effective and reliable power security plan.
  • Fri, July 29, 2011 – Manager – Theatre

    Fri, July 29, 2011 – Manager – Theatre We didn’t want to have to buy another generator, so contacted shentongroup to see if it was possible to change it from single to three phase power. The company has always looked after us very well so we knew we could rely on them, and, needless to say, … Continued
  • Engineering Manager – Hospital

    Thank you very much for your help.  Shentons provided a very good, fast service.  
  • Sun, September 11, 2011 – Facilities Manager Software Company – Reading

    Sun, September 11, 2011 – Facilities Manager Software Company – Reading shentongroup engineers were exceptionally clean and tidy and carried out a quality installation. The project was completed on time and was good value for money.
  • Building Service Manager – Large M&E Company

    Dear all, I am pleased to announce that ****** have successful handed over the ******* project within our contract date. It is a massive achievement and I would like to take this opportunity to thank you all for the time and effort you have all put in. I’m sure we would of not achieved it … Continued
  • Tue, May 03, 2011 – Infrastructure Technical Team Leader.

    Tue, May 03, 2011 – Infrastructure Technical Team Leader. shentongroup won the tender by not only providing the most competitive price but also on their proven track record.
  • Manager – Wireless Network Distributor

    Shenton Group has done an amazing job. Now we can maintain continuity when powercuts occur as lighting, IT equipment, telephones, heating and air conditioning are all supported by the UPS and the Power Call service. We are extremely impressed with the company and its service, support and expertise.
  • Tues, May 03, 2016 – Strategic Sales Manager, Client

    Tues, May 03, 2016 – Strategic Sales Manager, Client Thank you very much for this completion certificate and thanks to all the team, another quality installation from start to finish. I saw the installation on Friday and all seems to be ship ‘shaped!
  • Tues, October 28, 2014 – Manager, Important Historical Building

    Tues, October 28, 2014 – Manager, Important Historical Building I’d would like to thank you and the Shenton Group for acting so quickly in removing the generator from site. This has enabled the restoration works at ********* to take place and with a few days grace so we are all delighted. I understand that the … Continued
  • Tue, July 02, 2013 – Manager, Hire Company

    Tue, July 02, 2013 – Manager, Hire Company Chloe couldn’t do enough to help with the whole hire, she was great and makes you want to hire again and again. Would want to deal with her all the time – you know the job is going to be done. The guys on site were very … Continued

Secure Your Power, Protect Your Service

Let’s design a power solution that keeps your infrastructure running, without interruption. Speak to the UK’s leading technical experts today.