24/7 Emergency Call-Out

Dark Overlay

Education

Reliable Power Solutions for Education Facilities

Whether you manage a school or a large educational campus, continuous heat and power is essential for safety, comfort, and uninterrupted learning. Power failures can disrupt classes, damage equipment, and create compliance risks – issues no Facilities Manager wants to face.

Why Power Continuity Matters for Education

  • Protect Learning Environments – Ensure classrooms, labs, and IT systems stay operational.
  • Meet Compliance Standards – Avoid costly downtime and maintain health and safety obligations.
  • Peace of Mind for FM Teams – Reliable backup solutions reduce risk and stress for on-site managers.

Optimising CHP Systems for Efficiency

Combined Heat and Power (CHP) systems generate heat and electricity simultaneously, making them ideal for larger educational sites with significant hot water demand. Campuses with swimming pools, sports facilities, or student accommodation often benefit most from CHP technology for heating and power.

These systems lower energy costs, can reduce carbon emissions by up to 30%, and help meet sustainability targets.

At Shenton Group, we maintain and optimise CHP systems to ensure they operate at peak efficiency and deliver the highest possible return on investment. For educational facilities running long hours, this means lower bills, greener energy, and reliable performance without compromise.

Backup Power Solutions

If the unthinkable happens and mains power fails, having a backup generator system ensures your site isn’t left in the dark. We design robust solutions for resilience and compliance, giving FM teams confidence that critical life safety services such as emergency lighting and lifts will continue to operate.

When a permanent generator isn’t required, our Power Call emergency generator rental connection service provides rapid response and peace of mind.

Ready to Protect Your Campus?

Contact Us

Our Latest News

  • Case Study: Powering 150 Fibre Network Sites with Uninterrupted Power Solutions

    Location: NationwideClient: Leading National Fibre Network ProviderEnd User: Businesses and Consumers NationwideSector: Fibre Network Infrastructure Products/Services Used: Client Overview Our client is a leading national fibre network provider operating across 190+ sites. They deliver high-speed connectivity to businesses and consumers, relying on resilient power infrastructure to maintain continuous service availability. Their operations are critical to … Continued

  • Case Study: Shenton Group Provides Reliable Power to Global Biopharmaceutical Distribution Centres

    Sector: PharmaceuticalsLocation: Liverpool Products/ Services Background A global biopharmaceutical company, based in the north west of the UK, was expanding due to the increase in demand for pharmaceutical supplies during the COVID-19 pandemic. Further manufacturing and cold storage were required on-site, and temporary power was needed for this expansion. Project Overview Shenton Group was tasked … Continued

  • Case Study – Porton Science Park

    Client: Wiltshire CouncilSector: Local AuthorityLocation: Porton Down Products/Services Background Porton Science Park provides a platform for Science and Technology to innovate in an environment that welcomes and supports new business start ups. Working in partnership with Wiltshire council and DSTL (the Ministry of Defence’s Defence and Science Technology Laboratory), who are an existing customer, Shenton … Continued

  • Case Study: Amazon Distribution Centres

    Client: Amazon Direct Sector: Distribution Location: Tilbury Products/ Services Background Amazon Direct is one of the largest distributors in the UK with over 30 warehouses operating currently. In 2021 an unplanned service requirement arose in one of Amazon’s distribution centres, which resulted in the requirement for a rental generator. Shenton Group were asked to provide … Continued

  • Backup Generator Solution for Ilona Rose House

    Client: Gratte BrothersSector: Mixed-Use Development Location: Soho, London Products/Services Background Ilona Rose House, set in the heart of Soho, London, is a 31,0,00sqm new-build project spread over 13 floors, including four below ground. With a build cost of £100m, the development will contain shops, restaurants, bars, offices, residential apartments, a gallery and a nightclub. Shenton Group … Continued

  • Providing Power Continuity to Virgin Media

    The Virgin Media Technology Service Centre, a campus facility in Knowsley, UK, was subject to technical upgrading of its supportive infrastructure to better enhance the power resilience to the site.

    The existing Diesel Rotary Uninterruptible Power Supplies (DRUPS) technology became extremely expensive to maintain, leading to the decision to upgrade the equipment. Shenton Group was once again entrusted with this project due to an ongoing relationship with previous power installations for Virgin Media.

  • Manager – Wireless Network Distributor

    Shenton Group has done an amazing job. Now we can maintain continuity when powercuts occur as lighting, IT equipment, telephones, heating and air conditioning are all supported by the UPS and the Power Call service. We are extremely impressed with the company and its service, support and expertise.
  • Fri, April 26, 2013 – Facilities Maintenance Contract Manager, County Council

    Fri, April 26, 2013 – Facilities Maintenance Contract Manager, County Council Can you please give my thanks to the shentongroup engineers for successfully completing the generator panel modifications and testing of the system, I would like to thank Paul in particular for coping with the challenging situation under pressure, the shentongroup engineers performed excellently and … Continued
  • Fri, October 3, 2014 – FM Specialist, Leading Furniture Retailer

    Fri, October 3, 2014 – FM Specialist, Leading Furniture Retailer I’d like to take this opportunity to thank you all at shentongroup for the recent support you gave at the ***** ***** Service Office to resolve the issue in a very prompt and professional manner.
  • Alex Robinson – AD Plant Manager

    I have found Shenton Group to be a thoroughly professional organisation. Running an AD plant is a 24/7 operation, with constant oversight required. However, even though the CHPs are one of the most critical parts of the AD plant, I have no concerns about their operation, due to the efficiency of the support service provided.
  • Wed, October 21, 2015 – Project Manager, Building Consultants

    Wed, October 21, 2015 – Project Manager, Building Consultants Grant and Mark have been a pleasure to deal with thus far with this project, and I’ll personally make sure that you guys are invited to work with us on any and all generator projects that come up. Thanks again.
  • Tue, July 02, 2013 – Manager, Hire Company

    Tue, July 02, 2013 – Manager, Hire Company Chloe couldn’t do enough to help with the whole hire, she was great and makes you want to hire again and again. Would want to deal with her all the time – you know the job is going to be done. The guys on site were very … Continued
  • Sat, June 11, 2011 – Senior Building Services Engineer – Construction Comapany

    Sat, June 11, 2011 – Senior Building Services Engineer – Construction Comapany When the power outaged occurred the generator coped very well. shentongroup did an excellent job and I have no hesitation in recommending the company to others and using it again as the need arises.
  • Tue, July 30, 2013 – Service Sales Engineer, Contract Reseller Company

    Tue, July 30, 2013 – Service Sales Engineer, Contract Reseller Company Our Client has emailed – he wants me to pass on a big thank you to James and everyone else involved in the Gene hire over the last week.
  • Mon, April 14, 2014 – Specialist Suppliers & Installers of Alarm & Security Systems

    Mon, April 14, 2014 – Specialist Suppliers & Installers of Alarm & Security Systems Many thanks for all your help from start to finish with the project; great service.
  • Owner – Radio Station

    I can’t thank you and your team enough for your help with the generator over the weekend. It was the one single thing that I could worry about the least (apart from where to find the fuel gauge!).  It was easy to deal with you, the generator was delivered on time, a lovely piece of … Continued
  • Wed, October 14, 2015 – Electrical Foreman, Building Services Company

    Wed, October 14, 2015 – Electrical Foreman, Building Services Company Many thanks for all of your efforts over the past few days.  Is it possible to pass on my thanks to your site team for delivering another successful project?  We have received positive feedback from ********** for all of the work that was carried out, it was … Continued
  • Building Service Manager – Large M&E Company

    James, today’s training went well. Please let your mangers know Alex continued to be very thorough and professional when carrying out his work.